Careers rarely develop the way we plan them. Our career path often takes many twists and turns, with particular events, choices and people influencing our direction.

We asked Kevin Moran from Insurance to give some advice for people considering this job:


Kevin Moran

Insurance Administrator


Read more

  Kevin Moran
Work hard, it is important to have a good work ethic and to always be open to facing new challenges. An open mind is very important as the financial services industry is one that has undergone and will continue to undergo many changes. An appetite for learning is also very important as the need to broaden ones knowledge is paramount.

The Social person's interests focus on some aspect of those people in their environment. In all cases the social person enjoys the personal contact of other people in preference to the impersonal dealings with things, data and ideas found in other groups.

Many will seek out positions where there is direct contact with the public in some advisory role, whether a receptionist or a counsellor. Social people are motivated by an interest in different types of people, and like diversity in their work environments. Many are drawn towards careers in the caring professions and social welfare area, whilst others prefer teaching and other 'informing' roles.
Career Interviews
Sector Profiles
School Subjects (LC)
College Courses
Study Skills
Work Experience (School)
CV & Interview Preparation
Featured Article
logo imagelogo image
Return to List

A day in the life of a Geophysicist

"Installing the site takes about 2.5 hours, and most of that time is spent digging holes for each of the sensors. I then attach all the sensors to the recording box and set it to record data for the next 3 days." - Jessica Spratt, Geophysicist 

Today’s a day for data acquisition. I will be collecting broadband magnetotelluric data throughout Botswana.

7am, the team of 12 meets for breakfast to discuss the plan of action. Decide to split into 3 groups, each group pulling one recording unit out of the ground and putting a new one in further down the line. After packing up the landcruiser with all the necessary equipment and fuelling up, my group of 4 hits the road. When we get to our first site, the first thing I do is ensure that the unit is still recording and that the site has not been disturbed. 

There is a lot of local wildlife that enjoys chewing on wires nosing around the instruments! If all is well, I download the data and have a quick look at the time series to be sure that the equipment was working correctly before removing the equipment.

Magnetotellurics (MT) is a method that provides information on the electrical conductivity of the Earth by measuring the natural time-varying electric and magnetic fields at its surface. 

These fields are generated from electric currents that are produced from natural variations in the Earth’s magnetic field. 

The project in Botswana is part of a larger effort to understand the conductivity structure of the deep crust and upper mantle beneath Southern Africa. This involves putting in stations every 20 km along a profile, or highway, and allowing them to record for 3 days with the hope of obtaining information from depths of 150 – 200 km. Today we are working on the profile between Francistown and Kasane.

Setting up a new site is not quite as easy. After driving over 60 km down the highway to the next location, we drive around the area to find someone who works locally on the land. 

Good thing we have a local Setswana speaker with us, the farmer is able to find us a great spot under a large shady mopane tree where we can keep the recording box out of the sun. 

Installing the site takes about 2.5 hours, and most of that time is spent digging holes for each of the sensors. I then attach all the sensors to the recording box and set it to record data for the next 3 days.

On return to the lodge, there are a few chores to be done. The batteries that power the instruments need to be charged, the trucks tidied, equipment problems need to be tested and fixed, and accommodation needs to be booked for the following night. 

If we are going to be camping we will need to do some grocery shopping.

After a quick clean up, I then sit at the computer and back up the data from the three sites collected that day. 

The data is quickly processed giving us an indication of any changes to the site installation that are necessary the following day. If I have time, I will run more complex processing and edit the response curves so that each site will be ready for 2-dimensional modelling when we return to Dublin. 

But for today, I will enjoy the fantastic African sunset before the group meets again to discuss the day’s events, and plan for tomorrow.

Jessica Spratt - 

Article by: Jessica Spratt ~ Institute of Physics Ireland